RFP Coordination and Creation

I work as an end-to-end RFP Response Consultant. That means I handle everything from document receipt to document submission, including visual design and project management.

    1. Typically when working with a company on an RFP Response, I’ll begin by parsing all questions/technical requirements into an excel document with multiple tabs, as well as a tab for anything else we need, ex. SLA, MSA, references, cost proposal, etc.

    2. I then like to attend the vendor Q&A session to get clarification on anything that was not included in the RFP Request document, like user number, current systems, etc.

    3. What happens next depends on my relationship with the company and if we plan on having a long-term contract.

      1. When I plan to work with a company on their RFP processes long-term, I like to get to know the product as well as the SMEs. To do that, I begin by reviewing any demo videos, product documentation, or old RFPs that the company has. If available, I love to get on a call with the sales team to get any other questions answered in the form of another demo. I then synthesize a searchable feature database that makes the RFP construction process significantly smoother. That way I am able to fill in the excel doc myself, flagging any features I need extra input on from other teams. This database grows with every RFP submitted, meaning I need less and less input from the internal teams as our contract progresses.

      2. If it’s a one-off RFP, I review any documentation available to fill in what I can in the excel doc, or break it up and defer to individual teams to fill things in, depending on the level of involvement the company desires.

    4. Once all questions have been answered in the excel doc, I synthesize them into straightforward, outcomes-based narrative responses.

    5. I add any other required elements as part of the RFP package, and send to the team for review no later than 1 week before the RFP submission date.

    6. All edits, including visual design, are completed no later than 24 hours before the submission deadline.

Previous
Previous

Technical & Provider-Oriented Content

Next
Next

Naturopathic Copy